Photo of the deck of the new footbridge being lifted into position by a crane

Deck of new accessible footbridge installed

The deck of a new accessible footbridge at Patchway Station was hoisted into position by a giant crane over the Easter weekend, during a four-day closure of the railway. The previous footbridge needed to be replaced because it had insufficient clearance from the new overhead wires which are being installed as part of the multi-billion pound Great Western Mainline (GWML)

Continue reading